What it does
- Captures all maintenance activity details (date, technician, checklist notes).
- Logs material, labor, and external vendor costs for each task.
- Associates costs with specific assets, ensuring Total Cost of Ownership visibility.
- Provides comprehensive maintenance history reports for audits, budgeting, and ROI analysis.
Prerequisites
- Assets exist under
Assets > Asset List, with correct Asset Code and Location. - Preventive or Corrective Maintenance Tasks have been created under
Maintenance > Maintenance Task. - Under
Accounts > Chart of Accounts, ensure you have accounts for Maintenance Expense, Labor Expense, and Inventory (for spare parts). - Purchase Invoice or Expense Claim entries are enabled to record external vendor invoices.
Step 1: Complete the Maintenance Task
- Access the Maintenance Task
- Navigate to
Maintenance > Maintenance Task > List. - Filter by Status: In Progress or To Do and click the relevant task (e.g., MT-2025-0210 – Quarterly Filter Replacement).
- Navigate to
- Update Task Details
- In the Checklist section, tick off each inspection or repair step and add notes if any anomalies were discovered.
- In Comments, record observations (e.g., “Replaced air filter after observing heavy debris buildup”).
- Click Complete to move the task to Status: Completed.
- Once complete, the CGIC App timestamps the finish and logs the technician’s name.
Step 2: Log Material (Spare Parts) Costs
- Add Consumed Items
- Within the completed Maintenance Task, scroll to Consumed Items.
- Click + Add Row for each part used during maintenance:
- Item Code (e.g., “Air Filter Model A-123”).
- Quantity (e.g., 1).
- Rate (auto-populated from the Item Master or manually entered if ad-hoc).
- The CGIC App deducts consumed quantities from the linked Warehouse inventory and calculates the total material cost for the task.
- Verify Cost Posting
- After saving, the system posts a journal entry:
- Debit Maintenance Expense → Materials.
- Credit Inventory (Warehouse).
- Confirm the Consumed Items Total matches the sum of (Quantity × Rate) for all parts.
- After saving, the system posts a journal entry:
If a part is not stocked (e.g., a special gasket), create an Expense Claim or Purchase Invoice for later, as detailed in Step 3.
Step 3: Record Labor and External Vendor Costs
- Log Labor Hours
- In the completed Maintenance Task, update the Labor Hours field (e.g., 2.5 hours).
- The CGIC App multiplies Labor Hours by the Standard Labor Rate (configured under
Setup > Maintenance Settings) to calculate labor cost. - If you have multiple technicians on one task, click + Add Row under Labor Details to enter each technician and their respective hours and rate override if needed.
- Link External Vendor Invoice (If Applicable)
- If a third-party vendor performed part of the work (e.g., specialized pump rebuild), navigate to
Buy > Purchase Invoice > New. - Select the Vendor, Date, and the Maintenance Task Reference under References so costs link back to the correct task.
- Under Items, add the service line (e.g., “Pump Rebuild Service”) with Quantity = 1 and Rate = Vendor Charge.
- Save and Submit the Purchase Invoice. The CGIC App will:
- Debit Maintenance Expense → Services.
- Credit Accounts Payable (Vendor).
- In the Maintenance Task, click Refresh Cost Details (or navigate to the References section) to confirm the external cost is associated.
- If a third-party vendor performed part of the work (e.g., specialized pump rebuild), navigate to
Always enter vendor invoices against the Maintenance Task Reference to maintain a consolidated cost view per task.
Step 4: Review Total Maintenance Cost Per Task
-
View Cost Summary
- In the Maintenance Task record, check the Cost Details panel:
- Materials Cost (from Consumed Items).
- Labor Cost (Labor Hours × Rate).
- External Service Cost (from linked Purchase Invoice).
- Total Task Cost (aggregate of all three).
- In the Maintenance Task record, check the Cost Details panel:
-
Adjust and Approve
- If you notice discrepancies (e.g., incorrect part rate), click Edit and correct the Rate or Quantity in Consumed Items.
- For labor, if actual labor rate differs from the standard, override the Rate in the Labor Details section.
- After adjustments, click Save to update the total.
- When satisfied, the Maintenance Manager can click Approve Costs—locking the task’s cost details and triggering final accounting entries.
Approved costs generate a consolidated journal entry posting to your Maintenance Expense accounts and update the Asset Maintenance Ledger under each Asset record.
Step 5: Capture Maintenance History on the Asset
- Open the Asset Record
- Navigate to
Assets > Asset List. - Click the relevant asset (e.g., Pump-03 – Cooling Tower Pump).
- Navigate to
- View Maintenance Tab
- Select the Maintenance tab. Here you’ll see:
- Task ID (e.g., MT-2025-0210).
- Date Completed.
- Technician.
- Cost Summary.
- Attachments (photos/reports).
- Select the Maintenance tab. Here you’ll see:
- Historical Analysis
- Click Maintenance History Report under Asset to view all past tasks for that asset, sorted by date.
- Verify that each maintenance entry has:
- Checklist Notes (what was inspected/replaced).
- Cost Breakdowns (Material, Labor, External).
- Next Scheduled Maintenance (if auto-generated).