Prerequisites
- Item Setup: Both primary and alternate materials must exist as Items
- Example: Yeast-Brand-A and Yeast-Brand-B for Valdana Bread
- BOM Access: Your user role needs permissions to edit Bill of Materials
- Stock Settings: Enable Allow Item Alternatives in
Stock Settings
1. Overview
Alternate Materials ensure CGIC maintains continuous production even during supply shortages. For example:- Swap Imported Yeast with Local Yeast for Valdana Bread during shipping delays
- Use Recycled Pulp instead of Virgin Pulp for Onina Tissue to support sustainability initiatives
This feature prevents production halts without modifying your Bill of Materials (BOM).
2. Key Benefits
- Avoid Stoppages: Automatically suggest backups when primary materials run low
- Cost Control: Use cheaper alternatives during price spikes (e.g., Additive-Y vs Additive-X for Luca Oil)
- Flexibility: Manage temporary substitutions without permanent BOM changes
3. Step-by-Step Setup
3.1 Define Alternate Items
- Go to:
Stock > Items > [Select Item](e.g., Yeast for Valdana Bread) - Under Alternatives Section:
- Add Row
- Item Code: Select substitute (e.g., Yeast-Local)
- Qty Ratio: Set conversion (e.g.,
1:1if equal)
3.2 Enable in BOM
-
Open BOM:
Manufacturing > BOM > [BOM Name] - Check Allow Alternative Item for relevant components
-
Set Priority (1 = highest preference):
4. CGIC Product Examples
| Product | Primary Material | Alternate | Use Case |
|---|---|---|---|
| Ovita Waters | Blue Caps | White Caps | Supplier shortage |
| Luca Engine Oil | Additive-X ($10/L) | Additive-Y ($8/L) | Cost reduction |
| Valdana Bread | Brand A Yeast | Brand B Yeast | Supply chain delay |
5. During Production
- Auto-Prompt: System suggests alternates if primary stock is low during Stock Entry
- Manual Override: Operators can select alternates on Job Cards
- Audit Trail: Production records show which alternate was used